Studio Project Planner
ARCHITECTURE & INTERIOR DESIGN โ JAPAN
STEP 01 / 07
Project Type
Define the nature and scope of the commission
Discipline
Architecture
Interior Design
Architecture + Interior
Master Planning
Landscape
Project Category
New Build
Renovation / Kaishu
Extension
Interior Fit-Out
Conversion
Restoration
Sector
Residential โ Private
Residential โ Multi-unit
Commercial Office
Hospitality / Hotel
Retail
F&B / Restaurant
Cultural / Civic
Healthcare
Education
Industrial
Mixed Use
Location & Regulatory Context
STEP 02 / 07
Project Information
Client, site, and programme details
Client & Project
Programme & Area
Programme Brief
Key Dates
STEP 03 / 07
Scope of Work
Select all services included in the appointment
Architectural Services
Feasibility Study (ไบๅ่ชฟๆปใปๆณ็่ชฟๆป)
Concept Design (ๅบๆฌๆงๆณ)
Schematic Design / Basic Design (ๅบๆฌ่จญ่จ)
Design Development (ๅฎๆฝ่จญ่จๆบๅ)
Detailed / Working Drawings (ๅฎๆฝ่จญ่จ)
Building Permit Application (็ขบ่ช็ณ่ซ)
Long-Life Housing Certification (้ทๆๅช่ฏไฝๅฎ
)
Tender / Procurement (่ฆ็ฉใป็บๆณจๆฏๆด)
Construction Administration / Site Supervision (ๅทฅไบ็ฃ็)
Post-Occupancy Evaluation
BIM Modelling (BIMใขใใซ)
Visualisations / CG Renderings (CGไฝๆ)
Interior Design & FF&E Services
Interior Concept Design (ใคใณใใชใขๅบๆฌๆงๆณ)
Interior Detailed Design (ใคใณใใชใขๅฎๆฝ่จญ่จ)
Materials & Finishes Specification (ไปไธใไปๆง)
Lighting Design (็
งๆ่จญ่จ)
FF&E Design & Specification (ๅฎถๅ
ทใปๅๅ่จญ่จ)
FF&E Procurement Management
Bespoke Furniture Design (็นๆณจๅฎถๅ
ท่จญ่จ)
Artwork & Styling Curation
Specialist Coordination & Other Services
Structural Engineering Coordination (ๆง้ ่จญ่จ่ชฟๆด)
MEP / Equipment Engineering Coordination (่จญๅ่จญ่จ่ชฟๆด)
Seismic Retrofit Design (่้ๆนไฟฎ่จญ่จ)
Fire Engineering (ๆถ้ฒ่จญๅ่จญ่จ)
Landscape Design (ๅคๆงใปใฉใณใในใฑใผใ)
CDM / Safety Management (ๅฎๅ
จ็ฎก็)
Acoustic Design (้ณ้ฟ่จญ่จ)
Sustainability / ZEB Assessment (ZEB่ฉไพก)
Planning / Development Consultation
Project Management (ๅทฅ็จ็ฎก็)
STEP 04 / 07
Project Schedule
Programme stages with start dates and durations
Global Start Date
Stage Programme โ Toggle, adjust weeks & start date override
Gantt Overview
STEP 05 / 07
Construction Costs
Japan-market cost modelling by structure type and element
Indicative rates sourced from Japanese market data (2024โ25). Costs vary by prefecture, spec level, and market conditions. Tokyo rates shown โ apply regional factor for other prefectures. All figures in Japanese Yen (ยฅ). Consumption tax (ๆถ่ฒป็จ) at 10% applies.
Structural Frame Type & Indicative Rate
๐ชต Timber Frame (ๆจ้ )
ยฅ150,000โ220,000 /mยฒ
Traditional Japanese method (ๅจๆฅๅทฅๆณ) or 2ร4. Residential focus. Fast build, lower cost. Requires regular maintenance.
๐ฉ Light Steel Frame (่ปฝ้้้ชจ้ )
ยฅ220,000โ280,000 /mยฒ
Mid-rise residential and commercial. Good seismic performance. Faster erection than RC.
โ๏ธ Heavy Steel Frame (้้้้ชจ้ )
ยฅ280,000โ350,000 /mยฒ
Large-span commercial, industrial. High flexibility for open plans. Often used in S้ buildings.
๐๏ธ Reinforced Concrete โ RC (้็ญใณใณใฏใชใผใ้ )
ยฅ300,000โ420,000 /mยฒ
Residential, medium-rise. High durability, 60โ100+ year lifespan. Higher upfront cost; lower maintenance. Tokyo avg ยฅ416k/mยฒ.
๐ข Steel RC (SRC ้้ชจ้็ญใณใณใฏใชใผใ้ )
ยฅ380,000โ500,000 /mยฒ
High-rise, skyscrapers, complex programmes. Combines steel frame robustness with concrete mass.
๐ฒ Mass Timber / CLT (CLTๆจ้ )
ยฅ240,000โ320,000 /mยฒ
Contemporary mid-rise timber. Growing in Japan following regulatory changes. Premium aesthetic; sustainability credentials.
Cost Breakdown by Element
| Element | Basis | Rate (ยฅ/mยฒ) | Amount (ยฅ) |
|---|
Interior Fit-Out & FF&E
STEP 06 / 07
Fee Estimator
Professional fees โ with Japan market rate guidance
Japanese market guidance (ๅปบ็ฏๅฃซๆณ standard fees): Architecture design & supervision typically ranges 10โ20% of construction cost for residential; 8โ15% for commercial projects. Fees decrease as project value increases. Rates include design + ็ขบ่ช็ณ่ซ (building permit application) + construction supervision. Use the ใGuideใ buttons to see indicative breakdowns.
Architecture Fees
Architectural Design & Supervision (่จญ่จ็ฃ็ๆ)
Includes basic design, DD, working drawings, permit application & site supervision
5%25%
12%
| Construction Cost | Typical Arch. Fee % | Notes |
|---|---|---|
| Under ยฅ50M | 15โ20% | Small residential / complex programme |
| ยฅ50M โ ยฅ100M | 13โ17% | Medium residential / boutique commercial |
| ยฅ100M โ ยฅ200M | 10โ15% | Mid-scale commercial, hospitality |
| ยฅ200M โ ยฅ500M | 8โ12% | Large commercial, retail, mixed-use |
| Over ยฅ500M | 6โ10% | Large complex / institutional |
Source: ๅปบ็ฏๅฃซๆณ standard fee guidelines & japanese-architects.com market data 2024
Feasibility & Concept (Basic Stage)
Pre-contract investigation, zoning analysis, concept design only
0%8%
2%
Interior Design Fees
Interior Design (ใคใณใใชใขใใถใคใณๆ)
Concept through detailed design & specification
0%20%
5%
| Project Type | Typical Interior Fee | Notes |
|---|---|---|
| Residential Interior | 8โ18% of fit-out cost | Design + supervision |
| Hospitality / Hotel | 6โ12% of fit-out cost | Depends on FF&E procurement role |
| Commercial Office | 5โ10% of fit-out cost | Often fixed fee for larger schemes |
| F&B / Retail | 8โ15% of fit-out cost | High detail level required |
FF&E Procurement Commission
% of FF&E budget managed
0%25%
10%
Expenses & Tax
TOTAL PROFESSIONAL FEES (excl. tax)
ยฅโ
incl. consumption tax: ยฅโ
STEP 07 / 07
Project Summary
Review all details before exporting
Project Overview
Scope Summary
Programme
Cost & Fee Summary